Choose a railing post by its job in the run before choosing its shape. Intermediate, terminal, corner and stair-transition positions can require different holes, brackets, infill terminations and base details even when the visible post profile is the same. This category routes current ESANG post subjects so buyers can build a clear post schedule rather than request one generic post for every position.
Discuss a post schedule on WhatsApp
Current post routes
Start here when the hardware must wrap or align with a round face. State post diameter, every interface position and the required material grade rather than relying on appearance.
Start here for flat mounting faces and square-profile coordination. Face orientation matters when holes, clamps or brackets occur on more than one side.
Rectangular Stainless Steel Posts
Start here when the post has a directional face. Mark which dimension faces the railing run and which faces the opening.
Use for repeated positions between ends and corners. Hole or bracket repetition, post spacing and field alignment drive the schedule.
Use at the start or end of a run. State what terminates there – rail, bar, rod, cable hardware or another component – and on which face.
Use where direction changes. Provide the plan angle and show how rails and infill approach the post from each side.
Use at stair starts, landings or prominent transitions. Stair pitch, handrail transition and the base condition must be coordinated together.
Representative post forms
Role first, profile second
Post decision — Show on the schedule — Why it changes the order
Intermediair — Repeated hole or bracket pattern, spacing and upper support. — A terminal fitting copied to an intermediate position can obstruct a continuous run.
Terminal — End-facing hardware, end clearance and the side from which installation is accessed. — End forces and visible finishing differ from pass-through positions.
Hoek — Plan angle, incoming directions, corner rail detail and infill routing. — One-face drilling cannot simply be rotated if two runs meet with different interfaces.
Newel or transition — Stair pitch, landing elevation, handrail transition and base position. — The upper connection and visible height may change across a stair-to-landing transition.
Match every post interface
Profile and orientation
Round profiles require hardware shaped or adapted to a curved face. Square profiles provide flat faces but still need a defined face orientation. Rectangular posts add a long and short face, so the drawing must show which direction each post is installed. Do not approve a post from an elevation alone when side faces carry hardware.
Base and substrate
Pair the post body with the actual surface, fascia, core or custom mount. The quotation should identify the post-to-base connection and what base hardware is included. The project designer or engineer should define the installed loads, substrate capacity, edge distances and anchor requirements; a post photograph cannot answer those site questions.
Upper rail and infill
Mark the upper-rail support height, bracket or saddle type, and all infill interfaces. For bars or rods, specify pass-through versus stopped ends. For glass, identify the separate clamp or adapter route and glass build-up. For cable, provide the cable layout and distinguish pass-through, tensioning and terminal positions.
Material and finish
Request the material grade required by the project specification and exposure; grade cannot be confirmed from a photograph. State the finish and its direction on visible faces, plus any weld finishing or protective handling requirement. Ask the quotation to identify the proposed grade and finish rather than assuming the category title applies to every configuration.
Wat moet je versturen en wat moet je vergelijken?
A marked-up layout with labels such as I1 (intermediate), T1 (terminal), C1 (corner) and N1 (newel/transition) is enough to begin. Add available heights, profile preferences, base condition, top-rail detail, infill type and estimated quantities.
For a like-for-like comparison, require the proposal to state:
• post role, profile, orientation, height and quantity by type;
• proposed material grade and visible finish;
• base or mounting interface included and any excluded anchors;
• holes, slots, welded tabs, inserts, brackets and removable fittings;
• upper-rail and infill interfaces by face;
• factory assembly, loose parts, packaging and drawing approval points.
Choose between level, raked, and raked-to-level mesh panel geometry by railing run, pattern orientation, interfaces, and project drawings.
Specify handrail sleeves and splice locks by the actual tube interior, required retention and installation access so the connector can fit and be secured.
Zorg ervoor dat verbindingspunten worden voorzien van steunen, overgangen en toegangsmogelijkheden voor montage, zodat de breekpunten voor het transport ook fungeren als gedocumenteerde verbindingen in de geïnstalleerde leuning.
Connect the usable rail path with joint function, supports, movement and transport modules before issuing a continuous handrail specification.
Send coordinated run drawings, substrate details, finish references and scope requirements so surface-mount handrail quotes can be compared meaningfully.
Leg de bestaande ondergrond, de toestand van de randen, de afwerkingen, verborgen leidingen en installaties, de toegankelijkheid, de geometrie en de omvang van de reparatiewerkzaamheden vast voordat met de fabricage voor de aanpassing wordt begonnen.


Foshan ESANG Metal Products onderhoudt met trots CE-certificering (Verificatienummer TD32772401) onder de Richtlijn bouwproducten (Verordening nr. 305/2011), waarmee we onze toewijding aan de hoogste Europese veiligheids- en kwaliteitsnormen bevestigen.
Gecertificeerd Assortiment:
Ons uitgebreide assortiment railingbeslag - inclusief glasklemmen, spanners, beugels, muurbevestigingen, basischoenen, leuningbeslag, kabelbeslag en staanderonderdelen - voldoet aan de volgende eisen EN1906:2012 normen, zodat de structurele integriteit en betrouwbaarheid van de prestaties in alle installaties gewaarborgd zijn.
Wat dit betekent voor je project:
✓ Volledige naleving van regelgeving voor Europese en internationale markten
✓ Onafhankelijk geverifieerde veiligheids- en duurzaamheidsprestaties
✓ Documentatie-ondersteuning voor architecturale specificaties
Gemoedsrust dankzij kwaliteitsgarantie van derden
Certificering geldig tot 2027 | Testrapport: CE-FE24122001-CY

